Karratha Electrical Group (KEG) has delivered an extensive range of electrical infrastructure, sports lighting, aquatic centre lighting and lighting control upgrades across the Wickham Recreation Precinct.
The multi-stage works have supported the ongoing development and modernisation of the precinct, incorporating AFL and cricket oval lighting, rugby oval lighting, aquatic centre floodlighting, basketball and tennis court lighting, carpark and surrounding area lighting, and communications infrastructure.
KEG’s involvement has included project management, design and engineering coordination, structural and geotechnical investigations, construction management, electrical distribution upgrades, specialist lighting installations, automated control systems, testing and commissioning.
The works required careful planning and coordination across multiple operational sporting facilities, with a focus on improving lighting performance, energy efficiency, system reliability and long-term asset management.
The completed works have substantially modernised the electrical and lighting infrastructure across the Wickham Recreation Precinct, providing high-performance LED lighting for multiple sporting and community facilities.
The AFL and cricket oval lighting installation incorporates four new 33.5-metre towers and 48 Musco LED floodlights, achieving up to 529 lux maintained average illumination for cricket (Outdoor Cricket Class IV), delivering a high-performance lighting outcome in excess of AS 2560 sports lighting requirements.
The rugby oval lighting upgrade achieved a measured average illumination of 238 lux against a 200 lux requirement, with uniformity testing confirming a high-performance lighting outcome in excess of the nominated AS 2560 performance criteria.
Get in touch
From new projects and upgrades to maintenance and technical support, talk to KEG about what your site needs.