Karratha Electrical Group (KEG) delivered a range of electrical distribution, motor control and conveyor installation projects across Rio Tinto Dampier Salt operations in Western Australia.
Works included purpose-built distribution board replacements, a 200 kW conveyor VSD installation, the CV002 conveyor replacement electrical package at Port Hedland, and electrical and instrumentation works for the CV007 stacker replacement at Mistaken Island, Dampier.
Each project required integration with existing infrastructure, tailored installation arrangements and coordination with site operations and other construction teams. KEG’s involvement covered custom switchboard design and supply, electrical installation, testing, commissioning and handover.